Commercial
Gas

Table Rock Welcome Centre – Niagara Falls, ON

The Table Rock Welcome Centre, situated next to the world's most recognizable waterfall, hosts more that 8 million visitors per year. Viessmann heating technology in the form of three Vitocrossal 300, CT3 gas-fired condensing boilers, rated at 2702 MBH each, provides space heating for the Centre's new viewing gallery, as well as exterior ice and snow melt.

Table Rock Welcome Centre in Niagara Falls, Ontario
Table Rock Welcome Centre in Niagara Falls, Ontario

Background

Perched adjacent to Niagara's Horseshoe Falls, the Table Rock Welcome Centre hosts more than eight million visitors every year. The original structure has undergone numerous upgrades since its construction in 1853 to keep pace with an ever-increasing flow of tourists from around the world.

One of the the greatest challenges for the Table Rock Welcome Centre comes not from handling the scores of sightseers passing through each day, but from the Falls themselves: the dense veil of mist rising from the base of the Falls quickly freezes in cold weather to create thick, heavy layers of ice on nearby surfaces. When this occurs on rock formations and trees, it can add to site's natural beauty; however, the ice can also place enormous loads on man-made structures and create treacherous conditions for pedestrian traffic.

In 2008, the Niagara Parks Commission began construction on a covered pedestrian walkway straddling the Niagara Parkway and the Grand Hall – a two-level indoor viewing gallery offering panoramic views of the Falls in all weather conditions. The project also included the installation of equipment for space heating and preventing ice buildup in key areas of the complex.

 

The Viessmann solution

A boiler plant comprised of three Viessmann Vitocrossal 300, CT3-72 gas-fired condensing boilers was commissioned to provide heat for the viewing gallery and ice and snow melt system.

 

Installation details

The boiler cascade provides up to 1500 MBH for three air handling units in the Grand Hall, plus an additional 1000 MBH for melting ice and snow on the 2,500-square-foot pedestrian walkway and a 1,000-square-foot area at the main entrance.

The rooftop ice and snow melt system accounts for the bulk of the heating load. It consists of more than 5 km of ¾" copper piping winding back and forth across the roof. The piping was installed in the gaps of a wooden racking system and covered by metal mesh for protection during roof maintenance.

The entire system is managed by a Viessmann Vitocontrol-S, CT3 digital outdoor reset cascade control. The Vitocontrol-S is programmed to keep supply temperatures slightly above freezing, while full modulation and staging ensure maximum turndown operation for greatest efficiency.

 

The results

The Viessmann boilers continue to provide reliable and efficient service while minimizing operating costs for The Niagara Parks Commission. Together, the space heating in the Grand Hall and the exterior ice and snow melt system have helped to keep the Table Rock Welcome Centre a safe and comfortable destination all year round.

 

Project details

Project year2008

Equipment


3 x Vitocrossal 300, CT3-72
Vitocontrol-S, CT3 Cascade Control

Rated output

7848 MBH / 2301 kW

Engineer

Group 8 Engineering, Hamilton, ON

Mechanical contractor          

Besseling Mechanical Inc., Hamilton, ON

Related References

Trout Lake Community Centre & Ice Rink
Commercial
Gas

Trout Lake Community Centre and Ice Rink – Vancouver, BC

Vancouver's Trout Lake Community Centre is a LEED certified, state-of-the-art multi-use sports and recreational facility. The Centre's gas-fired condensing boiler system consists of a total of seven Vitodens 200 boilers.

Read more
Social Housing Project – Toronto, ON
Apartments
Gas

Social Housing Project – Toronto, ON

Three Vitocrossal 300, CA3 commercial condensing boilers, each rated at 4000 MBH, replaced two outdated and oversized boilers to provide reliable, efficient heat to three high-rise apartment buildings.

Read more
Evergreen Brick Works – Toronto, ON
Commercial
Gas
Solar

Evergreen Brick Works – Toronto, ON

The Evergreen Brick Works is a multi-use facility comprising various structures, including the LEED Platinum certified Centre for Green Cities (CGC). The five-storey CGC's space heating and domestic hot water needs are satisfied by a Vitocrossal 300, CT3 condensing boiler, augmented by two Vitorond 200, VD2 boilers and six Vitosol 200-F flat plate solar thermal collector panels.

Read more
YMCA - Sturgeon Bay, WI
Commercial
Gas

YMCA - Sturgeon Bay, WI

A commercial boiler and hot water system replacement for the Sturgeon Bay YMCA pool led to increased efficiency and reliability.

Read more
Vitocrossal 300 CA3 gas condensing boiler
Commercial
Gas

The Jordan Hotel - Sunday River, Maine

Viessmann’s largest condensing boiler helps resort reach new levels of fuel efficiency.

Read more
Vitocrossal 300 CA3 gas condensing boilers
District heating
Gas

School District, Portsmouth, RI

Funding High Efficiency Boiler Conversion with Fuel Savings.

Read more
How can we help?
How can we help?