Social Housing Project – Toronto, ON

Three Vitocrossal 300, CA3 commercial condensing boilers, each rated at 4000 MBH, replaced two outdated and oversized boilers to provide reliable, efficient heat to three high-rise apartment buildings.

Boilers installed in Social Housing Project in Toronto, Ontario. Image courtesy of TAF and Ecosystem.

Background

In 2016, The Atmospheric Fund (TAF), a climate action agency for the Greater Toronto and Hamilton Area, and a social housing provider worked together to energy retrofit  seven buildings across three sites, with the work delivered by Ecosystem.  

One of these building sites, located in Toronto, consists of three high rise apartment buildings that were heated with two outdated, inefficient and oversized boilers, which resulted in high maintenance and utility bills and poor indoor comfort for residents. The decision was made to replace these boilers with modern, gas-fired condensing boilers that would achieve high operating efficiency and reduce overheating during the winter.

  

The Viessmann solution

Three Vitocrossal 300, CA3 stainless steel gas-fired condensing commercial boilers, each rated at 4,000 MBH, were brought online in December of 2016, with commissioning and operating performance optimization taking place in January and February of 2017. The boilers were installed in the basement level of one of the buildings where they constitute a central heating plant and serve the space heating loads of all three buildings. Onboard Vitotronic 300 cascade controls modulate input and automatically stage and rotate boilers to precisely match heating loads. In addition, the boilers’ high turndown ratio of 10:1 each allows the boilers to fire at very low levels when outdoor conditions are mild to accurately match the building load.

  

Installation details

Prior to installation, each of the three boilers were disassembled, brought into the mechanical room and reassembled in place on housekeeping pad. A primary/secondary piping arrangement was created with VFD boiler loop pumps. A common venting arrangement is used allowing all three boiler vents to be combined into a single stack up to the top of the building. The Viessmann control package includes a Vitogate 300 BACnet gateway to permit the Building Automation System (BAS) to send a common supply temperature setpoint, in addition to monitoring operational data from all three boilers. Temperature set points to the various heating loops are under control of the BAS and will be modified based on information gathered from TAF’s indoor environmental quality monitoring program measuring indoor space heating temperatures.

  

The results

  • The main goals in re-designing the heating system were:
    1. Provide better control of boilers and the heating system to address overheating
    2. Better align building demand with boiler capacity
      
  • Estimated annual fuel savings of 167,000 m³ of natural gas
      
  • Estimated annual fuel cost savings of over $55,700 ($0.3319/m³)
      
  • Significantly lower maintenance costs


Note: At time of writing, a complete analysis of overall post-retrofit cost savings was not yet available.

  

Project details

Project year2016

Equipment

3 x Vitocrossal 300, CA3

Rated input

4000 MBH each

Client

Social housing provider supported by The Atmospheric Fund (TAF)

Design-build firm         

Ecosystem

Related References

Commercial
Gas

Trout Lake Community Centre and Ice Rink – Vancouver, BC

Vancouver's Trout Lake Community Centre is a LEED certified, state-of-the-art multi-use sports and recreational facility. The Centre's gas-fired condensing boiler system consists of a total of seven Vitodens 200 boilers.

Read more
Commercial
Gas

Table Rock Welcome Centre – Niagara Falls, ON

The Table Rock Welcome Centre, situated next to the world's most recognizable waterfall, hosts more that 8 million visitors per year. Viessmann heating technology in the form of three Vitocrossal 300, CT3 gas-fired condensing boilers, rated at 2702 MBH each, provides space heating for the Centre's new viewing gallery, as well as exterior ice and snow melt.

Read more
Commercial
Gas
Solar

Evergreen Brick Works – Toronto, ON

The Evergreen Brick Works is a multi-use facility comprising various structures, including the LEED Platinum certified Centre for Green Cities (CGC). The five-storey CGC's space heating and domestic hot water needs are satisfied by a Vitocrossal 300, CT3 condensing boiler, augmented by two Vitorond 200, VD2 boilers and six Vitosol 200-F flat plate solar thermal collector panels.

Read more
Commercial
Gas

YMCA - Sturgeon Bay, WI

A commercial boiler and hot water system replacement for the Sturgeon Bay YMCA pool led to increased efficiency and reliability.

Read more
Commercial
Gas

The Jordan Hotel - Sunday River, Maine

Viessmann’s largest condensing boiler helps resort reach new levels of fuel efficiency.

Read more
District heating
Gas

School District, Portsmouth, RI

Funding High Efficiency Boiler Conversion with Fuel Savings.

Read more
How can we help?
How can we help?